The full list of 2023 MnDOT construction projects in Twin Cities Metro is available.

ST. PAUL MN – The Minnesota Department of Transportation released information about the more than 200 projects that its crews are working on in spring and summer. This includes dozens of construction projects within the Twin Cities metropolitan area.

In a press release, Commissioner Nancy Daubenberger said: “After a winter of record snowfalls and cold temperatures, MnDOT welcomes the arrival spring.”

The warmer weather will also mean more orange cones, work zones and people working around highway projects. MnDOT is planning a large construction program this year. We need drivers’ help in order to keep everyone as safe as possible. Please obey speed limits, slow down when you are in a work zone, turn off your cell phone and any other distractions. Be patient and plan ahead for road closures.

Below is a list of all state-funded construction projects in Twin Cities, along with MnDOT’s summaries of each.

Highway 5

Close Crimson Bay Rd access on Hwy 5 in Chanhassen and construct new connections

Resurface Hwy 5, from Mendota St. in St. Paul, to Hwy 120 in Maplewood. Repair/replace drainage. Improve pedestrian access at intersections. Replace traffic signals at Forest St., Earl St., Ruth St., and Johnson Pkwy. Improve accessibility to modern standards (ADA), make safety improvements. Build stormwater treatment basins at the Edgerton St/White Bear Ave interchanges on Hwy 36

Highway 10

Rebuild the Hwy 47/169 Interchange, build noise walls, add auxiliary lanes, and update accessibility to modern standards.

Add turn lane, access improvements to Riverdale Dr south of Hwy 10 in the city of Ramsey.

Highway 13

Construct a bridge over the highway 101 interchange and build frontage roads to Quentin Ave.

Highway 21

Build trails and a roundabout at Sawmill Rd/CR 66 in Jordan.

I-35W:

Concrete Repair with Diamond Grinding of I-35W, Hwy 61 and metrowide

Construction of stormwater system along NB I-35W between 42nd St and 0.1 mile south from 40th St, Mpls

Resurface I-35W from Minnesota River bridge to 0.1 mile south of W 82nd St in Bloomington; construct auxiliary/acceleration lanes, update accessibility (ADA) to meet modern standards

Landscape I-35W in Mpls from 26th Ave. to 31st St.

Landscape I-35W in Mpls from Park Ave. to 26th St.

Landscape I-35W, from Cliff Rd. in Burnsville to 106th Street in Bloomington

Landscape I-35W, from CR C in Roseville (NE 29th Ave.) to Sunset Ave. in Blaine

Highway 36

Construct Hwy 36 ramps in Roseville at the CR 48 (Fairview Ave.) interchange; resurface and improve drainage, signaling, and accessibility (ADA).

Landscape Hwy 36, from Searle St. to Arcade St. in Maplewood

Landscape Hwy 36 at Manning Ave, Lake Elmo/Stillwater

Highway 41

Resurface highway 41 at the intersection of Peavey Road in Chaska, including pavement markings and guardrail work

Resurface Hwy 41 between 0.23 miles north-east of Pioneer Trl, Chaska and Hwy 5 in Chanhassen

Highway 52

Resurface Hwy 52 between 0.2 mile north of CR 86 in Hampton Township and 0.2 mile north of CR42 (145th St.) in Rosemount. Repair 2 bridges. Add cable median guardrail

Highway 55

Mendota Heights: Replace railings and lighting along Hwy 55/62 at the Minnesota River Bridge

Highway 56

Construction of turn lanes along Hwy 56 at the new CR 88, Randolph Township

Highway 62

Mendota Heights: Repair the pavement along Hwy 62 between Hwy 13 and Lexington Ave.

Highway 65

Rehabilitate the Third Avenue bridge on Highway 65 in Mpls

Bridge repairs on Hwy 65 at CR 10 (Central Ave.) in Spring Lake Park

Replace pipe crossings and construct crossovers along Hwy 65 between 97th Ave. in Blaine and Klondike Dr. in East Bethel

I-94

MnDOT’s portion of the project is to repair I-94 bridges that cross St Croix River between Lakeland, MN, and Hudson, WI.

Resurface I-94 between Hwy 120 (Century Ave.) in Oakdale and the St Croix River at Lakeland. This includes traffic management, drainage, signage, lighting, guardrails, noise walls, median barriers, and improving accessibility (ADA) for modern standards. Construct a EB auxiliary lane from I-94/I-494/I-694 (Oakdale) to Hwy 19 in Woodbury. I-94: Widen and reinforce bituminous shoulder from Hwy 120, Oakdale, to St Croix River, Lakeland. Update traffic management system; improve drainage; add bituminous crossings

Rebuild the I-94 St. Croix Rest Area Buildings in Lakeland including picnic, trails and pet exercise areas

Construction of St Croix weigh-station inspection pit along I-94, Lakeland

Construction of new pedestrian facilities that meet modern accessibility standards (ADA) at the I-94 Elm Creek Rest area in Maple Grove

Repair the bridge over I-94 on Plymouth Ave in Mpls

Landscape I-94 in Mpls from Williams Ave to Warwick St

Highway 95

Improved Hwy 95 Approach at CR 28 in Denmark Township

Improvements to pedestrian and cycling facilities along Chestnut Street from Hwy 95 up to the Stillwater Lift Bridge (project led by the City of Stillwater)

Repair the drainage on Hwy 95 from 0.14 mile north of Pillar Rd up to 0.52 mile north of CR 26 at Scandia

Improvements to pedestrian and cycling facilities along Chestnut Street from Hwy 95 up to the Stillwater Lift Bridge (project led by the City of Stillwater)

Repair the drainage on Hwy 95 from 0.14 mile north of Pillar Rd up to 0.52 mile north of CR 26 at Scandia

Replace the lighting at William O’Brien State Park and at Hwy 95/97 at Scandia intersection.

Highway 169

Rebuild interchange, pavement, traffic signals, and trails between Nathan Lane and Gettysburg Ave. in New Hope.

Construction of noisewall along NB Hwy 169 between Bass Lake Rd and 62nd Ave, New Hope

Install a pavement edge drainage system on Hwy 169, between Old Brick Yard Rd and Canterbury Rd (Shakoee), from 0.42 mile east of Old Brick Yard Rd.

Install cable median barriers and drainage improvements at the intersections of Hwy 169 from Hwy 19 in Blakeley Township up to Hwy 25 in Belle Plaine.

Install traffic management systems on Hwy 169 from Hwy 41 in Shakopee to Canterbury Rd, and Hwy 41 between Hwy 169 and the Minnesota River near Chaska.

Hwy 212

Resurface Hwy 212 in Cologne from 0.14 mile west of CR 36, (Lake St W), to 0.7 mile east of CR 36, (Lake St E); repair 2 bridges and install cable median barriers

Hwy 244, Hwy 284, Hwy 96

Chip seals on Hwy 244, 284 and 96 in the metro area

Hwy 252

Improve intersection at 66th Ave and install warning flashers on 85th Ave.

I-394

Fix drainage and improve accessibility to modern standards along I-394 between Washington Ave. and 3rd Ave. in Mpls.

I-494

Work on lighting and pavement repair on I-494 at the NB exit of Lake Rd, Woodbury

Reconstruct I-35W/494 interchange in Bloomington/Richfield; repair, replace and construct new bridges from West Bush Lake Road to Hwy 77

Reconstruct I-35W/494 interchange in Bloomington/Richfield; repair, replace and construct new bridges from West Bush Lake Road to Hwy 77

Source

Leave a Comment

Your email address will not be published. Required fields are marked *